24-hour operation scenario: Without REM, all selected loads are assumed to operate throughout the day. With REM, they switch off during the selected vacancy period and remain on for the remaining hours. Refrigerators are excluded.
Reducing the electrical load may help reduce thermal stress on the transformer. Verified spare capacity may enable investments previously limited by insufficient transformer capacity.